The log builds itself
Every submittal is filed against the project, the spec section and the revision it belongs to, the moment it arrives. The status on the log is the status of the document, because they are the same record.
Every submittal carries a date and a decision: when it arrived, who reviewed it, what came back, and how many times it went around. On a long-lead item those dates decide whether material is ordered on time. BuildCycle keeps the log and the revision history without anyone typing a row.
The GC sends a shop drawing. Somebody marks it up, stamps it, and sends that file back — and the file that goes back is what the job gets built from. Today it leaves as an email attachment while the log entry is typed somewhere else, so the record and the log are two separate things kept by the same person. Keeping them in step is the work, and it is the part that slips when a week gets busy.
Every submittal is filed against the project, the spec section and the revision it belongs to, the moment it arrives. The status on the log is the status of the document, because they are the same record.
Mark it up and stamp it in the browser, on the document itself. The stamp sits above your markup and above the sheet, and the flattened copy the GC receives is exactly what you saw when you signed it.
Revise & Resubmit starts the next round without starting a new paper trail. Every cycle is numbered and dated against the first submission, so the question at closeout — how many times did this go around — already has an answer.
Watch ninety days of a job run in four seconds. The number of submittals tells you how busy it was. How they came back tells you what it cost.
The mix of review outcomes, and how it shifts as the job runs.
Median days from receipt to returned, tracked by reviewer.
The ones that cannot be ordered until the review comes back.
The second round is the expensive one. A submittal approved on the first pass costs one review. Revise & Resubmit costs two, plus the GC's turnaround in between — and the lead time keeps running the whole way through.
Which is why the mix matters more than the count. A job drifting toward resubmittals is not a busier job, it is a slower one, and the delivery date moves whether or not anyone updates the schedule.
A submittal held two extra weeks is not a filing problem. It is a long-lead item not ordered, a delivery date that moves, and a crew that arrives to find nothing to install. The GC feels it first and the Owner hears about it next — and from where the Owner sits, a slow review and an indifferent design team look identical.